What is an As-Built in Construction?

Understanding the concept of an "as-built" in construction is crucial for anyone involved in the field. This article aims to provide a simple and easy-to-understand explanation of what an as-built is, its benefits, and the conditions in which it is commonly used.

I. What is an As-Built?

  • Definition: An as-built refers to the final set of drawings or documents that accurately depict the physical changes made during construction.
  • It captures the actual dimensions, locations, and configurations of various elements in a construction project.

II. Positive Aspects of As-Built in Construction:

  1. Accuracy: As-builts ensure that the final construction matches the intended design accurately, minimizing errors and discrepancies.
  2. Documentation: It serves as a comprehensive record of the completed project, aiding in future maintenance, repairs, or renovations.
  3. Compliance: As-builts help verify compliance with building codes, regulations, and permits.
  4. Decision-making: They provide valuable insights for future projects, allowing contractors and architects to make informed decisions based on real-world experiences.

III. Benefits of Using As-Built in Construction:

  1. Troubleshooting: As-builts help identify and resolve any issues or conflicts
Testimonial 1: Name: Sarah Johnson Age: 32 City: New York City "I was always curious about what is as builts in construction, and thanks to this incredible keyword search tool, I finally got my answer! It's amazing how this tool provided me with clear and concise information about this topic. I'm truly impressed! As someone who works in the construction industry, having access to such knowledge is invaluable. I can now confidently explain as builts to my colleagues and clients. This tool has made my life so much easier. Kudos to the team behind it!" Testimonial 2: Name: John Anderson Age: 45 City: Los Angeles "I've been in the construction business for years, and yet, I never fully grasped the concept of as builts. But thanks to this keyword search, I finally discovered what is as builts in construction! It's mind-blowing how this tool managed to simplify such a complex topic. It's like having a personal construction encyclopedia in my pocket! Now, whenever someone asks me about as builts, I can confidently explain it to them, thanks to the knowledge gained from this search. This tool is a game-changer!" Testimonial

What does as-built include?

What is a Construction “As-Built?” Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

What is included in as-built drawings?

As-built drawings (also referred to as red-line drawings or as-builts) are revised sets of drawings submitted by a contractor upon the completion of the project. They reflect all the changes made during the construction process and provide an exact rendering of the finished product.

What is the legal definition of as-built?

The record of the building after construction has been completed, including all changes to work scope, materials installed, measurements, and so on. This record shows the geometry and location of all building elements completed under the contract.

What is the difference between as-built and as installed?

As Built drawings can also be called As Installed drawings, As Constructed drawings and As Executed drawings. An As Built drawing documents the changes that have been made throughout the job and the changes that have been made since the last revision of drawings.

What do as-built plans look like?

As-Built drawings should show the building exactly as it currently is, as opposed to a design drawing which shows the intended or proposed layout of the building. This is a critical distinction, because a constructed building almost never corresponds exactly to the original design drawings.

What is the difference between as-built and as constructed?

“As-built” is defined as the record drawings and documentation defining deviation to the designed information occurring during construction at the end of the project. “As-constructed” defines the defect and deviation to the designed model occurring during construction.

Frequently Asked Questions

What is required for as built drawings?

As mentioned above, As Built drawings include an extensive amount of details and documents. The following are some examples of such details: Changes in materials, dimensions, locations, installations, fabrications, etc. Dates that changes were made.

What is included in the as-built plan?

As-built drawings should include:

Dates and detailed notes of any modifications. Changes to materials used (type, size, location, etc.) Changes to locations, including windows, doors, plumbing, etc. Any obstructions and solutions used.

What is the difference between as-built and as plan?

What is the As-Planned versus As-Built Method? The As-Planned versus As-Built Method simply compares what actually happened to what was supposed to happen. It measures the activities of the baseline or other planned schedule against that of the as-built schedule or schedule updates to identify encountered delays.

What is the meaning of as-built conditions?

In the architecture and construction industry, “As-Built” refers to a drawing that shows the existing dimensions and conditions of a building, space, or area.

What is the difference between as-built and plans?

As-Built drawings should show the building exactly as it currently is, as opposed to a design drawing which shows the intended or proposed layout of the building. This is a critical distinction, because a constructed building almost never corresponds exactly to the original design drawings.

What is the purpose of as-built?

As-built drawings (also referred to as red-line drawings or as-builts) are revised sets of drawings submitted by a contractor upon the completion of the project. They reflect all the changes made during the construction process and provide an exact rendering of the finished product.

What is the difference between as drawing and as-built drawings?

Only the shop drawings can be changed as they are yet in the pre-development stage. The as-built drawings, on the other hand, cannot be changed as the building has already been constructed. However, they can be changed during the renovation works.

What are as-built drawings and why are they necessary?

Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

What should be on as-built drawing?

As-built drawings show a project's components including location, dimensions, and all other related measurements. Other details are also included such as specifications of walls, doors, windows, plumbing, and electrical wiring fixtures.

FAQ

What are the three types of construction drawings?

Common types of construction drawings include Architectural Drawings, Structural Drawings, Electrical Drawings, Plumbing and Sanitary Drawings, and Finishing Drawings. Each type focuses on specific aspects of the project.

Are as-built drawings accurate?
Inaccurate as-built drawings are a common cause of planning errors and inefficiencies during project operations. It is impossible for stakeholders to make informed decisions regarding project design improvements or component replacement or repair based on drawings that do not represent the reality on the ground.

How do you write as-built drawings?
Recording as-built drawings
  1. Clear descriptions instead of vague phrases.
  2. All changes in materials used, locations, sizing, and more.
  3. We try not to change the scale of the drawings, but if it is necessary, we note those changes accordingly.
  4. Location of all utilities including depth and the materials of each.
What is required for as-built drawings?

As mentioned above, As Built drawings include an extensive amount of details and documents. The following are some examples of such details: Changes in materials, dimensions, locations, installations, fabrications, etc. Dates that changes were made.

What is the difference between construction drawing and as built drawing?

Shop drawings are developed before the construction begins, so they can be changed as they are in the pre-development stage. Whereas As-built drawings cannot be changed as they are created after project completion, however they can be changed during renovation or maintenance works.

What are the 6 major types of drawings in a set of construction drawings?
Types of Design and Construction Drawings
  • Architectural Drawings.
  • Structural Drawings.
  • HVAC Drawings.
  • Electrical & Plumbing Drawings.
  • Firefighter Drawings.
  • Miscellaneous Drawings.
Who compiles as-built drawings?

Who Creates As-Built Drawings? Typically, the architects or designers who originally designed the project will also create the as-builts. They are familiar with the original specifications and are therefore the most qualified to reflect recorded changes.

What does as-built mean in construction?

Definition. A set of drawings that are marked-up by the contractor building a facility or fabricating a piece of equipment that show how the item or facility was actually built versus the way it was originally designed. At the completion of a project, the as-built drawings describe what was actually built.

What is an as built in construction

Why are as-built drawings important in construction?

Architectural as-built drawings are important because they provide a permanent record of the building's final configuration and can be used for future reference, maintenance, or modifications.

What is the purpose of the as-built plan?

What is a Construction “As-Built?” Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

What are the benefits of as-built drawings?

An as-built plan offers four important benefits, like improving onboarding, assisting the facilities team, streamlining the permitting process, and improving the renovation process. Using mobile technology helps improve field records and as-built drawings.

What does as-built condition mean?

In the architecture and construction industry, “As-Built” refers to a drawing that shows the existing dimensions and conditions of a building, space, or area.

What is the purpose of as-built drawings?

As-built drawings (also referred to as red-line drawings or as-builts) are revised sets of drawings submitted by a contractor upon the completion of the project. They reflect all the changes made during the construction process and provide an exact rendering of the finished product.

What is the importance of as-built?

The purpose of as-built drawings is to provide an accurate record of the final construction of a project. They provide a common reference point that everyone can use to understand the construction of the project and to make any necessary modifications or repairs.

What does as-builts mean in construction?

Definition. A set of drawings that are marked-up by the contractor building a facility or fabricating a piece of equipment that show how the item or facility was actually built versus the way it was originally designed. At the completion of a project, the as-built drawings describe what was actually built.

What is the difference between construction and as-built?

Between the initial plans and the completed building, all construction projects go through changes and modifications. As the name implies, as-built drawings are illustrations that reflect how a project was actually built — after the many revisions that typically occur during the construction process.

  • What is the use of as-built drawings?
    • Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

  • What are the 6 types of construction drawings?
    • Types of Drawings:
      • Plans:
      • Exterior & Interior Elevations:
      • Building & Wall Sections:
      • Exterior & Interior Details:
      • Schedules & Room Finishes:
      • Framing & Utility Plans:
  • Who draws as-built drawings?
    • Architects

      Who Creates As-Built Drawings? Typically, the architects or designers who originally designed the project will also create the as-builts. They are familiar with the original specifications and are therefore the most qualified to reflect recorded changes.

  • What is the difference between as-built and record plans?
    • Record drawings :

      These are compiled by the designer from the as-built drawings submitted by the contractor, as a record of the work. Since these are not confirmed in the field by the designer they are not "as-built" but a compiled record.

  • What is as-built in construction
    • Jun 4, 2023 — As-built drawings are documents that make it easy to compare and contrast between designed and final specifications. Final as-built drawings 

  • What is the difference between construction drawing and as-built drawing?
    • Shop drawings are developed before the construction begins, so they can be changed as they are in the pre-development stage. Whereas As-built drawings cannot be changed as they are created after project completion, however they can be changed during renovation or maintenance works.

  • What do as-built drawings show?
    • What is a Construction “As-Built?” Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

  • How would a as built submittal be if no changes occurred construction
    • Apr 4, 2023 — As Built drawings are defined as “Revised set of drawing submitted by a contractor upon completion of a project or a particular job.